Archive for 27/06/2009
Breefing date: June 21th, 2009
1.Determine of fat and total solid content checked at the beginning of production (first product) and after stop for a long time.
2.QA corporate meeting will be held in Indolakto ice cream at Tuesday.
3. Volumetric calibration, getting from Mr. Agus Subadri.
4.Heavy metal an Listeria external test in this month.
5.Legian chocolate coating is out of spec.